Boiler Facilities General Permit (GP)

Boiler Facilities General Permit (GP)

Revised On: Mar. 1, 2024 - 7:50 a.m.

This permit allows for the production of heat and/or steam for various purposes through boilers or combination of boilers with a cumulative maximum heat input of greater than 10 Million BTU per hour. This permit does not cover boilers with a heat input greater than 100 Million BTU per hour, or boilers that are fired with diesel or oil if they are manufactured after June 9, 1989. This permit is valid for five years from the date of issuance.

View a copy of the Boiler General Permit | Download >

Boiler Facilities General Permit | Download Application >