Type 4 General Permit Fees

Water Fees

Type 4 General Permit Fees

Permits by rule issued for sewage collection systems and on-sites (septics). These fees are subject to an annual adjustment and will be updated on this page annually.

Water Quality

Protection Service

Description

Permit Fee

4.01 General Permit:

Sewage Collection Systems

Under each Notice of Intent to Discharge, the fee is assessed on a per-component basis for the components listed below and is assessed cumulatively up to the maximum fee:

 

  • Maximum fee

  • Force mains with design flow less than or equal to 10,000 gpd

  • Each additional increment of 50,000 gpd or less of force mains

  • Gravity sewer with design flow less than or equal to 10,000 gpd

  • Each additional increment of 50,000 gpd or less of gravity sewer

  • Each sewer lift station

  • Each depressed sewer

  • Realignment of existing sewer for a contiguous project that is less than 300 linear feet with no change in design flow or pipe size

 

 

 

 

 

$35,675

$1,427

$1,427

$1,427

$1,427

$1,427

$1,427

$714

 

4.01 General Permit

courtesy review

If an applicant requests courtesy review, the Department shall approve or deny the request. When determining whether to approve a courtesy review request, the Department shall consider the complexity of the project and the Department’s current workload

One-third applicable fee upon submittal, then balance of fee if Notice of Intent to Discharge is submitted with final documentation within 180 days of first submittal

4.23 General Permit:

3,000 to less than 24,000 Gallons per day Design Flow

Onsite wastewater treatment facility with up to:

Three treatment technologies and disposal methods consisting of technologies or designs that are covered under other Type 4 general permits; and Two onsite wastewater treatment facilities

 

Maximum fee (cumulative)

 

  • Each additional onsite wastewater treatment facility on the same Notice of Intent to Discharge up to the maximum fee
  • Each additional treatment technology or disposal method consisting of technologies or designs that are covered under other Type 4 general permits on the same Notice of Intent to Discharge up to the maximum fee

$5,137

 

 

 

 

$10,703

 

$1,712

 

 

$714

4.23 General Permit annual report

Annual report required under A.A.C. R18-9-E323(G)

$285

Type 4

General Permits

(4.02 through 4.22)

  • Maximum fee

  • First Type 4 general permit

  • Each additional Type 4 general permit on the same Notice of Intent to Discharge

$5,280


$1,712


$714

 

Alternative Design under A.A.C. R18-9-A312(G)

A request for an alternative design, installation, or operational feature per alternative design:

 

  • Type 4.01 general permit

  • All other Type 4 general permits

 

 

 

$1,070

$357

 

Interceptor under

A.A.C. R18-9-A315

A design requiring an interceptor (per interceptor)

$143

Transfer

Transfer of discharge authorization

$71

Priority Review

If an applicant requests priority review, the Department shall approve or deny the request. When determining whether to approve a priority review request, the Department shall consider the complexity of the project and the Department’s current workload.

Double the Applicable Fee (including any applicable maximum fee)

 