[Stormwatergp] ---CGP 2013 -- CORRECTION: tracked changes colors are REVERSED

Stormwater Construction General Permit stormwatergp@lists.azdeq.gov
Tue Apr 24 14:39:48 MST 2012


CORRECTION:

Today, your tracked changes colors are:   EPA 2012 CGP (brown)     and     ADEQ revisions (violet).  Original ADEQ CGP 2008 and accepted language in this permit is still in black font.

Sorry for the confusion in my earlier e-mail.

 --- DT
________________________________
From: Dennis L. Turner
Sent: Tuesday, April 24, 2012 2:27 PM
Subject: Revisions to CGP 2013 now posted for May 1st meeting

Greetings:

Revisions to the draft ADEQ CGP 2013 have been made and the up-to-date version is now posted at http://www.azdeq.gov/environ/water/permits/cgp.html .

Please come prepared to discuss the following revisions/ additions to this draft (which forms the basis of the agenda May 1):

*               Part 3.1.2.3:  Revised final stabilization language; new language (combined Parts 3.1.2.3 and 3.1.2.4)
*               Part 3.2:  Revised Water Quality Standards language per Apr. 18th stakeholder discussion
*               Part 4 (Inspections) revisions made reflecting stakeholder discussions April 18th; visual assessment language is not entirely resolved and the discussion should be continued, in conjunction with Part 7.3
*               Part 5 (Corrective Actions) revisions made reflecting stakeholder discussions April 18th. Routine maintenance is not a corrective action; the revised language tries to make this clear and that corrective actions are only required when a control measure fails to meet the requirements of Part 3, or a discharge results in a permit violation. In contrast, failure to write a SWPPP, or having a very deficient SWPPP, would be a permit violation, but not require a corrective action.
*               Part 6 - SWPPP language revised reflecting stakeholder discussions April 18th up to Part 6.3(7)
*               New language included with this draft:  Part 7 - Monitoring Requirements for Discharges to Impaired or OAWs.

NOTE:
                *** Major additions to Appendix A (Definitions) were posted on April 18 ***


NEXT STAKEHOLDER MEETING:
DATE AND TIME: Tuesday, May 1, 9:30 a.m. to 3:00 p.m. (with a break for lunch)
LOCATION: ADEQ, room 3175, 1110 W. Washington St., Phoenix.
Participation by web conferencing at the May 1, 2012 and all future CGP stakeholder meetings will be available at these locations:

 *   Tucson - SAHBA
2840 North Country Club Road, Tucson, Arizona 85716
Contact Paula Meade, (520) 795-5114, paula@sahba.org<mailto:paula@sahba.org> for information.

 *   Bisbee - Cochise County Office, Contact Shon Brady, (520) 432 - 9329 for information.


************************************
Dennis L. Turner
ADEQ, Surface Water Section
1110 W. Washington St.
Phoenix, AZ 85007



-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.azdeq.gov/pipermail/stormwatergp/attachments/20120424/a077fe66/attachment-0001.html>


More information about the Stormwatergp mailing list