Permit(s) needed for a Water Company/Utility
What is a Water Company/Utility:
The following is required when running a Water Company/Utility in Arizona:
If you have a drinking water system, you may need a Drinking Water Facility Approval to Construct | Learn More >
If you have an operator that monitors drinking water/wastewater systems, you may need an Operator Certification for Water and Wastewater Systems | Learn More >
If you have a generator, you may need a Generators GP | Learn More >
If you have hazardous waste to dispose of, you may need an Application for a Hazardous Waste EPA ID Number | Learn More >
1.04 GP: Discharge from a Facility that Receives Water from a Well if Discharge is to the Same Aquifer: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
1.05 GP: Discharge of Backwash or Condensate if less than 1000 Gallons Per Day: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
3.02 GP: Process Water Discharges from Water Treatment Facilities | Learn More >
3.05 GP: Disposal Wetlands | Learn More >
If you discharge water pollutants, you may need an Individual APP | Learn More >
If you temporarily need to discharge water pollutants, you may need a Temporary Individual APP | Learn More >
If you have a septic system, you may need an On-site Wastewater Treatment System (Type 4.02 - 4.23 GP) | Learn More >
If you discharge pollutants into US waters, you may need an AZDPES Individual Permit | Learn More >
If you have a drywell, you may need a Drywell Registration | Learn More >
If using reclaimed water, you may need a Direct Reuse of Reclaimed Water Individual Permit | Learn More >
If your industry has stormwater discharges due to mining, then you may need an AZPDES MSGP Mining Permit | Learn More >
If your industry has certain types of non-stormwater discharges to surface waters, then you may need an AZPDES De Minimis GP | Learn More >
If your industry has stormwater discharges, you may need an AZPDES MSGP Industrial Stormwater or No Exposure Certification | Learn More >
This listing may not be comprehensive depending upon the specifics of your facility. Additional permits or registrations may be needed, therefore ADEQ recommends you contact the Permit Liaisons if unsure of permit requirements.