Skip to main content

WPD | VRP | Honeywell Peoria Ave.

VRP Site

Honeywell Peoria Ave.

Revised On: Nov. 15, 2023 - 4:00 p.m.

Location: 

  • North 23rd and Peoria Avenue, Phoenix, Arizona

Acceptance Into Voluntary Remediation Program (VRP):

  • July 28, 1999

Contaminants of Concern (COCs):

  • Chlorinated volatile organic compounds (VOCs)

Affected Media:

  • Groundwater

What are My Health Risks:

For Groundwater | If you are connected to a Public Water System (PWS) there is little to no risk of impact from exceedances because the water is filtered through the PWS for residential and business use | View Drinking Water Notices >

If you have a private well in the vicinity of the exceedance, we encourage you to test the well water

Not sure what to test for? | Learn More >

Site Summary:

  • Monitor wells are sampled on an annual basis.
  • Monitoring reports are submitted on an annual basis and are reviewed by ADEQ.
  • A Periodic Site Review (PSR) Report is submitted every 3 years and is reviewed by ADEQ.  The latest PSR was submitted and approved by ADEQ in December 2020.
  • A groundwater extraction system is in operation and was designed specifically to contain the groundwater plume.
  • In May 2018, Honeywell submitted a work plan for the installation of two down-gradient sentinel wells.
  • In September 2018, Honeywell installed a monitoring well to delineate the northern boundary of the plume.
  • In February 2019, Honeywell installed a monitoring well, delineating the western boundary of the plume.
  • In August 2019, Honeywell submitted and ADEQ approved groundwater flow model.
  • In August 2022, ADEQ met with Honeywell and requested additional items be added to the site metrics.
  • The next Periodic Status Report, which includes a thorough evaluation of remedy goals and site metrics, is due March 2024.

Project Manager
P: 602-771-2256
Email >


VRP Unit Manager
P: 602-771-1612
Email >