Arizona's Total Maximum Daily Load Program - History and Current Status as of 01/25/07

 

Bill Williams Watershed

Impaired Water Pollutant(s) Covered Status Downloadable Information Types of Point/ Nonpoint Sources Approved by EPA Implementation Plans/Activities Staff Contact Name
Alamo Lake Mercury Modeling is complete. Drafting TMDL document. Fact Sheet Under investigation; mining? No No S. Fitch
Boulder Creek - Wilder Creek to Copper Creek Arsenic The final TMDL report has been completed. TMDL Document Hillside Mine (abandoned), remnant tailings piles 7/26/04 Part 1: Characterization
Part 2: Implementation Plan
J. Sutter
Copper 7/26/04
Zinc 7/26/04

Up to top

Colorado River/Grand Canyon Watershed

Impaired Water Pollutant(s) Covered Status Downloadable Information Types of Point/ Nonpoint Sources Approved by EPA Implementation Plans/Activities Staff Contact Name
No past or current projects in this watershed

Up to top

Colorado River/Lower Watershed

Impaired Water Pollutant(s) Covered Status Downloadable Information Types of Point/ Nonpoint Sources Approved by EPA Implementation Plans/Activities Staff Contact Name
Lower Colorado River - Yuma USGS Gage 0952110 to International Border Nitrogen The final TMDL report has been completed. In hardcopy at ADEQ
D. Cameron
  1992 No J. Sutter
Phosphorus   1992 No

Up to top

Little Colorado River Watershed

Impaired Water Pollutant(s) Covered Status Downloadable Information Types of Point/ Nonpoint Sources Approved by EPA Implementation Plans/Activities Staff Contact Name
Lake Mary (lower) Mercury Modeling completed, drafting TMDL Report. Fact Sheet Under investigation No No S. Fitch
Lake Mary (upper) Mercury Modeling completed, drafting TMDL Report. Fact Sheet Under investigation No No S. Fitch
Little Colorado River - Nutrioso to Carnero Turbidity The final TMDL report has been completed. TMDL Document
ranching, golf course 09/30/02 No J. Sutter
Little Colorado River - Porter Tank to McDonald's Wash Copper Sampling is ongoing. Fact Sheet unknown NoNo J. Sutter
Silver
Little Colorado River - Water Canyon to Nutrioso Turbidity The final TMDL report has been completed. TMDL Document
ranching, golf course 09/30/02 No J. Sutter
Long Lake Mercury Modeling completed, drafting TMDL Report. Fact Sheet Under investigation No No S. Fitch
Lyman Lake Mercury     Under investigation No No D. Buchanan
Nutrioso Creek - headwaters to Little Colorado River Turbidity The final TMDL report has been completed. CWA 319 projects ongoing. TMDL Document
nonpoint sources, grazing 09/08/00 Yes J. Sutter
Rainbow Lake pH The final TMDL report has been completed. In hardcopy at ADEQ
D. Cameron
Fact Sheet
historic agricultural runoff, historic septic, internal nutrient cycling 01/00 AZGF has harvested S. Fitch
Nitrogen 01/00 AZGF has harvested
Phosphorus 01/00 AZGF has harvested
Soldier's Annex Lake Mercury Modeling completed, drafting TMDL Report. Fact Sheet Under investigation No No S. Fitch
Soldier's Lake Mercury Modeling completed, drafting TMDL Report. Fact Sheet Under investigation No No S. Fitch

Up to top

Middle Gila Watershed

Impaired Water Pollutant(s) Covered Status Downloadable Information Types of Point/ Nonpoint Sources Approved by EPA Implementation Plans/Activities Staff Contact Name
French Gulch - headwaters to Hassayampa River Cadmium The final TMDL report has been completed. TMDL Document inactive mine 06/05 No J. Sutter
Copper 06/05 No
Zinc 06/05 No
Hassayampa River - headwaters to Copper Creek Cadmium The final TMDL report has been completed. TMDL Document
abandoned mines 11/25/02 No J. Sutter
Copper 11/25/02 No
Zinc 11/25/02 No
Queen Creek - Headwaters to Superior WWTP Copper Sampling is ongoing. Fact Sheet mining No No K. Palmer
Queen Creek - Superior WWTP to Potts Canyon Copper Sampling is ongoing. Fact Sheet mining No No K. Palmer
Turkey Creek - tributary at 34°19'28"/112°21'28" to Poland Creek Cadmium Coordination is ongoing with the Forest Service. The draft TMDL is being reviewed. TMDL Document Golden Belt Mine and Golden Turkey Mine (abandoned); bedload No No J. Sutter
Copper No No
Zinc No No

Up to top

Salt River Watershed

Impaired Water Pollutant(s) Covered Status Downloadable Information Types of Point/ Nonpoint Sources Approved by EPA Implementation Plans/Activities Staff Contact Name
Christopher Creek - headwaters to Tonto Creek E. Coli The final E. Coli TMDL report has been completed. TMDL Document
wildlife, recreation, septic systems 7/26/04 No J. Sutter
Crescent Lake High pH     Under investigation No No D. Buchanan
Pinto Creek - headwaters to tributary at 33°19'27"/ 110°54'56"
Copper EPA approved the Phase I TMDL in April 2001. ADEQ developing site specific standard. TMDL Document
Site-specific Standard Report
Appendix A
Appendix B
mining 04/01 No (NPDES permit pending for mine) G. Olsen
Pinto Creek - Ripper Spring to Roosevelt Lake
Copper ADEQ developing site specific standard for Copper. Site-specific Standard Report
Appendix A
Appendix B
mining No No G. Olsen
Selenium
Pinto Creek - tributary at 33°19'27"/ 110°54'56" to Ripper Springs
Copper EPA approved the Phase I TMDL in April 2001. ADEQ developing site specific standard. TMDL Document
Site-specific Standard Report
Appendix A
Appendix B
mining 04/01 No (NPDES permit pending for mine) G. Olsen
Salt River - headwaters to Roosevelt Lake Phosphorus The final TMDL report has been completed. In hardcopy at ADEQ
D. Cameron
  1987 No J. Sutter
Tonto Creek - headwaters to tributary at 34°48'10"/111°04'14" Nitrogen The final Nitrogen and E. Coli TMDL reports have been completed. Nitrogen TMDL Document wildlife, recreation, septic systems, fish hatchery 06/05 Yes J. Sutter
E. Coli E.Coli TMDL Document 7/26/04 Yes
Draft TMDL Implementation Plan
Tonto Creek - tributary at 34°48'10"/111°04'14" to Haigler Creek Nitrogen The final Nitrogen and E. Coli TMDL reports have been completed. Nitrogen TMDL Document wildlife, recreation, septic systems, fish hatchery 06/05 Yes
Draft TMDL Implentation Plan
J. Sutter
E. Coli E.Coli TMDL Document 7/26/04 Yes

Up to top

San Pedro Watershed

Impaired Water Pollutant(s) Covered Status Downloadable Information Types of Point/ Nonpoint Sources Approved by EPA Implementation Plans/Activities Staff Contact Name
Brewery Gulch - Wildcat Canyon to Mule Gulch Copper Modeling has been completed. Additional sampling is necessary to support development of a site specific standard. Sampling is ongoing.   mining, nonpoint sources, acid rock drainage No Phelps Dodge is implementing stormwater measures G. Olsen
Mule Gulch - Bisbee WWTP to Highway 80 Bridge Cadmium Modeling has been completed. Additional sampling is necessary to support development of a site specific standard. Sampling is ongoing.   mining, nonpoint sources, acid rock drainage No Phelps Dodge is implementing stormwater measures. G. Olsen
Copper No
pH No
Zinc No
Mule Gulch - above Lavendar Pit to Bisbee WWTP Copper Modeling has been completed. Additional sampling is necessary to support development of a site specific standard. Sampling is ongoing.   mining, nonpoint sources, acid rock drainage No Phelps Dodge is implementing stormwater measures G. Olsen
pH No Phelps Dodge is implementing stormwater measures
Mule Gulch - headwaters to above Lavendar Pit Copper Modeling has been completed. Additional sampling is necessary to support development of a site specific standard. Sampling is ongoing.   mining, nonpoint sources, acid rock drainage No Phelps Dodge is implementing stormwater measures G. Olsen
San Pedro River - Aravaipa Creek to Gila River E. coli and selenium   Fact Sheet
(FS07-11)
Under investigation No No C. Breslin
San Pedro - Babocomari to Dragoon Wash E. Coli Sampling is ongoing. Fact Sheet Under investigation No No J. Sutter

Up to top

Santa Cruz River Watershed

Impaired Water Pollutant(s) Covered Status Downloadable Information Types of Point/ Nonpoint Sources Approved by EPA Implementation Plans/Activities Staff Contact Name
Alum Gulch - headwaters to ephemeral reach Cadmium The final TMDL report has been completed. TMDL Document abandoned mines, natural background 08/03 Yes
Draft TMDL Implementation Plan
J. Sutter
Copper 08/03
pH 08/03
Zinc 08/03
Arivaca Lake Hg The final TMDL report has been completed. In hardcopy at ADEQ
D. Cameron
  1999   S. Fitch
Harshaw Creek - headwaters to ephemeral segment Copper The final TMDL report has been completed. TMDL Document abandoned mines, natural background 08/03 No J. Sutter
pH 08/03 No
Zinc 08/03 No
Lakeside Lake Dissolved Oxygen The final TMDL report has been completed. TMDL Document reclaimed water, stormwater No City of Tucson installed new aeration system on 06/25/02. City and ADEQ will monitor lake water quality for first year as part of implementation plan. S. Fitch
Ammonia
Nutrients
pH
Parker Canyon Lake Mercury Sampling is ongoing. Fact Sheet Under investigation No No L. DeGraaf
Pena Blanca Lake Hg The final TMDL report has been completed. The USFS has remediated the most likely source of Hg to the lake. In hardcopy at ADEQ
D. Cameron
  1999 Yes S. Fitch
Three R Canyon - headwaters to ephemeral segment Cadmium The final TMDL report has been completed. TMDL Document abandoned mines, natural background 08/03 No J. Sutter
Copper 08/03 No
Zinc 08/03 No

Up to top

Verde River Watershed

Impaired Water Pollutant(s) Covered Status Downloadable Information Types of Point/ Nonpoint Sources Approved by EPA Implementation Plans/Activities Staff Contact Name
East Verde River - American Gulch to Verde River Arsenic and boron     Under investigation No No K. Palmer
Oak Creek - headwaters to Verde River Nitrogen The final TMDL report has been completed. CWA 319 projects ongoing. In hardcopy at ADEQ
D. Cameron
  1987 Yes J. Sutter
Phosphorus   1987 Yes
Oak Creek - headwaters to Verde River Nitrogen The final TMDL report has been completed. In hardcopy at ADEQ
D. Cameron
fish hatcheries, wildlife, recreation, septic systems 1999 N/A J. Sutter
Phosphorus 1999 N/A
Fecal Coliform The final TMDL report has been completed. CWA 319 projects ongoing. In hardcopy at ADEQ
D. Cameron
1999 Yes S. Fitch
J. Sutter
E. coli 1999 Yes
Munds Creek - headwaters to Oak Creek Nitrogen The final TMDL report has been completed. In hardcopy at ADEQ
D. Cameron
waste water treatment plant 1999 NPDES J. Sutter
Phosphorus 1999
Peck's Lake DO The final TMDL report has been completed. TMDL Document

internal nutrient cycling
05/14/02 Stormwater permit (NPDES) S. Fitch
pH 05/14/02 Stormwater permit (NPDES)
Nutrients N/A Stormwater permit (NPDES)
Stoneman Lake
DO The final TMDL report has been completed. CWA 319 projects are ongoing. TMDL Document
internal nutrient cycling 09/08/00 Yes S. Fitch
pH 09/08/00 Yes
Nutrients 09/08/00 Yes
Verde River - 15060203 to Above West Clear Creek Turbidity The final TMDL report has been completed. TMDL Document
grazing, recreational uses 05/14/02 No J. Sutter
Verde River - 15060202-065 to Below Railroad Draw Turbidity The final TMDL report has been completed. TMDL Document
grazing, recreational uses 05/14/02 No J. Sutter
Verde River - headwaters to West Clear Creek Phosphorus Further sampling to characterize contributions from groundwater is necessary. ADEQ is supporting the USGS Verde basin investigation. Assimilation study on hold until data is available.   effluent discharges, growth No No J. Sutter
Nitrogen No No
Verde River - Oak Creek to Fossil Creek Nitrogen The final TMDL report has been completed. In hardcopy at ADEQ
D. Cameron
  1987 No J. Sutter
Phosphorus   1987 No
Verde River Sycamore Creek - Oak Creek Turbidity The final TMDL report has been completed. TMDL Document
grazing, recreational uses 05/14/02 U.S. Forest Service has implemented grazing, road, grassland and stream restoration BMPs. J. Sutter
Watson Lake Nitrogen, dissolved oxygen, pH     Under investigation No No S. Fitch

Up to top

Upper Gila Watershed

Impaired Water Pollutant(s) Covered Status Downloadable Information Types of Point/ Nonpoint Sources Approved by EPA Implementation Plans/Activities Staff Contact Name
Gila River - Bonita Creek to Yuma Wash E. coli and sediment   Fact Sheet Under investigation No No D. McCarty
Gila River - Skully Creek to San Francisco River Selenium   Fact Sheet Under investigation No No D. McCarty
Luna Lake Nitrogen The final TMDL report has been completed. Fact Sheet
internal nutrient cycling, wildlife, grazing, septic systems 09/08/00 In Process S. Fitch
Phosphorus 09/08/00 In Process
pH 09/08/00 In Process
DO 09/08/00 In Process

Up to top

Back