|
Arizona's Total Maximum Daily Load Program - History and Current Status as of 01/25/07
Bill Williams Watershed
| Impaired Water |
Pollutant(s) Covered |
Status |
Downloadable Information |
Types of Point/ Nonpoint Sources |
Approved by EPA |
Implementation Plans/Activities |
Staff Contact Name |
| Alamo Lake |
Mercury |
Modeling is complete. Drafting TMDL document. |
Fact Sheet |
Under investigation; mining? |
No |
No |
S. Fitch
|
| Boulder Creek - Wilder Creek to Copper Creek |
Arsenic |
The final TMDL report has been completed. |
TMDL Document |
Hillside Mine (abandoned), remnant tailings piles |
7/26/04 |
Part 1: Characterization
Part 2: Implementation Plan |
J. Sutter |
| Copper |
7/26/04 |
| Zinc |
7/26/04 |

Colorado River/Grand Canyon Watershed
| Impaired Water |
Pollutant(s) Covered |
Status |
Downloadable Information |
Types of Point/ Nonpoint Sources |
Approved by EPA |
Implementation Plans/Activities |
Staff Contact Name |
| No past or current projects in this watershed |

Colorado River/Lower Watershed
| Impaired Water |
Pollutant(s) Covered |
Status |
Downloadable Information |
Types of Point/ Nonpoint Sources |
Approved by EPA |
Implementation Plans/Activities |
Staff Contact Name |
| Lower Colorado River - Yuma USGS Gage 0952110 to International Border |
Nitrogen |
The final TMDL report has been completed. |
In hardcopy at ADEQ
D. Cameron
|
|
1992 |
No |
J. Sutter
|
| Phosphorus |
|
1992 |
No |

Little Colorado River Watershed
| Impaired Water |
Pollutant(s) Covered |
Status |
Downloadable Information |
Types of Point/ Nonpoint Sources |
Approved by EPA |
Implementation Plans/Activities |
Staff Contact Name |
| Lake Mary (lower) |
Mercury |
Modeling completed, drafting TMDL Report. |
Fact Sheet |
Under investigation |
No |
No |
S. Fitch
|
| Lake Mary (upper) |
Mercury |
Modeling completed, drafting TMDL Report. |
Fact Sheet |
Under investigation |
No |
No |
S. Fitch
|
| Little Colorado River - Nutrioso to Carnero |
Turbidity |
The final TMDL report has been completed. |
TMDL Document
|
ranching, golf course |
09/30/02 |
No |
J. Sutter
|
| Little Colorado River - Porter Tank to McDonald's Wash |
Copper |
Sampling is ongoing. |
Fact Sheet |
unknown |
No | No |
J. Sutter
|
| Silver |
| Little Colorado River - Water Canyon to Nutrioso |
Turbidity |
The final TMDL report has been completed. |
TMDL Document
|
ranching, golf course |
09/30/02 |
No |
J. Sutter
|
| Long Lake |
Mercury |
Modeling completed, drafting TMDL Report. |
Fact Sheet |
Under investigation |
No |
No |
S. Fitch
|
| Lyman Lake |
Mercury |
|
|
Under investigation |
No |
No |
D. Buchanan
|
| Nutrioso Creek - headwaters to Little Colorado River |
Turbidity |
The final TMDL report has been completed. CWA 319 projects
ongoing. |
TMDL Document
|
nonpoint sources, grazing |
09/08/00 |
Yes |
J. Sutter
|
| Rainbow Lake |
pH |
The final TMDL report has been completed. |
In hardcopy at ADEQ
D. Cameron
Fact Sheet |
historic agricultural runoff,
historic septic, internal
nutrient cycling |
01/00 |
AZGF has harvested |
S. Fitch
|
| Nitrogen |
01/00 |
AZGF has harvested |
| Phosphorus |
01/00 |
AZGF has harvested |
| Soldier's Annex Lake |
Mercury |
Modeling completed, drafting TMDL Report. |
Fact Sheet |
Under investigation |
No |
No |
S. Fitch
|
| Soldier's Lake |
Mercury |
Modeling completed, drafting TMDL Report. |
Fact Sheet |
Under investigation |
No |
No |
S. Fitch
|

Middle Gila Watershed
| Impaired Water |
Pollutant(s) Covered |
Status |
Downloadable Information |
Types of Point/ Nonpoint Sources |
Approved by EPA |
Implementation Plans/Activities |
Staff Contact Name |
| French Gulch - headwaters to Hassayampa River |
Cadmium |
The final TMDL report has been completed. |
TMDL Document |
inactive mine |
06/05 |
No |
J. Sutter
|
| Copper |
06/05 |
No |
| Zinc |
06/05 |
No |
| Hassayampa River - headwaters to Copper Creek |
Cadmium |
The final TMDL report has been completed. |
TMDL Document
|
abandoned mines |
11/25/02 |
No |
J. Sutter
|
| Copper |
11/25/02 |
No |
| Zinc |
11/25/02 |
No |
| Queen Creek - Headwaters to Superior WWTP |
Copper |
Sampling is ongoing. |
Fact Sheet |
mining |
No |
No |
K. Palmer
|
| Queen Creek - Superior WWTP to Potts Canyon |
Copper |
Sampling is ongoing. |
Fact Sheet |
mining |
No |
No |
K. Palmer
|
| Turkey Creek - tributary at 34°19'28"/112°21'28" to Poland Creek |
Cadmium |
Coordination is ongoing with the Forest Service. The draft TMDL is being reviewed. |
TMDL Document |
Golden Belt Mine and Golden
Turkey Mine (abandoned); bedload |
No |
No |
J. Sutter
|
| Copper |
No |
No |
| Zinc |
No |
No |

Salt River Watershed

San Pedro Watershed
| Impaired Water |
Pollutant(s) Covered |
Status |
Downloadable Information |
Types of Point/ Nonpoint Sources |
Approved by EPA |
Implementation Plans/Activities |
Staff Contact Name |
| Brewery Gulch - Wildcat Canyon to Mule Gulch |
Copper |
Modeling has been completed. Additional sampling is necessary to
support development of a site specific standard. Sampling is
ongoing. |
|
mining, nonpoint sources, acid
rock drainage |
No |
Phelps Dodge is implementing stormwater measures |
G. Olsen
|
| Mule Gulch - Bisbee WWTP to Highway 80 Bridge |
Cadmium |
Modeling has been completed. Additional sampling is necessary to
support development of a site specific standard. Sampling is
ongoing. |
|
mining, nonpoint sources, acid rock drainage |
No |
Phelps Dodge is implementing stormwater measures. |
G. Olsen
|
| Copper |
No |
| pH |
No |
| Zinc |
No |
| Mule Gulch - above Lavendar Pit to Bisbee WWTP |
Copper |
Modeling has been completed. Additional sampling is necessary to
support development of a site specific standard. Sampling is
ongoing. |
|
mining, nonpoint sources, acid
rock drainage |
No |
Phelps Dodge is implementing stormwater measures |
G. Olsen
|
| pH |
No |
Phelps Dodge is implementing stormwater measures |
| Mule Gulch - headwaters to above Lavendar Pit |
Copper |
Modeling has been completed. Additional sampling is necessary to
support development of a site specific standard. Sampling is
ongoing. |
|
mining, nonpoint sources, acid
rock drainage |
No |
Phelps Dodge is implementing stormwater measures |
G. Olsen
|
| San Pedro River - Aravaipa Creek to Gila River |
E. coli and selenium |
|
Fact Sheet
(FS07-11) |
Under investigation |
No |
No |
C. Breslin
|
| San Pedro - Babocomari to Dragoon Wash |
E. Coli |
Sampling is ongoing. |
Fact Sheet |
Under investigation |
No |
No |
J. Sutter
|

Santa Cruz River Watershed
| Impaired Water |
Pollutant(s) Covered |
Status |
Downloadable Information |
Types of Point/ Nonpoint Sources |
Approved by EPA |
Implementation Plans/Activities |
Staff Contact Name |
| Alum Gulch - headwaters to ephemeral reach |
Cadmium |
The final TMDL report has been completed. |
TMDL Document |
abandoned mines, natural
background |
08/03 |
Yes
Draft TMDL Implementation Plan |
J. Sutter
|
| Copper |
08/03 |
| pH |
08/03 |
| Zinc |
08/03 |
| Arivaca Lake |
Hg |
The final TMDL report has been completed. |
In hardcopy at ADEQ D. Cameron
|
|
1999 |
|
S. Fitch
|
| Harshaw Creek - headwaters to ephemeral segment |
Copper |
The final TMDL report has been completed. |
TMDL Document |
abandoned mines, natural background |
08/03 |
No |
J. Sutter
|
| pH |
08/03 |
No |
| Zinc |
08/03 |
No |
| Lakeside Lake |
Dissolved Oxygen |
The final TMDL report has been completed. |
TMDL Document |
reclaimed water, stormwater |
No |
City of Tucson installed new aeration system on 06/25/02. City and ADEQ will monitor lake water quality for first year as part of implementation plan. |
S. Fitch
|
| Ammonia |
| Nutrients |
| pH |
| Parker Canyon Lake |
Mercury |
Sampling is ongoing. |
Fact Sheet |
Under investigation |
No |
No |
L. DeGraaf
|
| Pena Blanca Lake |
Hg |
The final TMDL report has been completed. The USFS has
remediated the most likely source of Hg to the lake. |
In hardcopy at ADEQ D. Cameron
|
|
1999 |
Yes |
S. Fitch
|
| Three R Canyon - headwaters to ephemeral segment |
Cadmium |
The final TMDL report has been completed. |
TMDL Document |
abandoned mines, natural background |
08/03 |
No |
J. Sutter
|
| Copper |
08/03 |
No |
| Zinc |
08/03 |
No |

Verde River Watershed
| Impaired Water |
Pollutant(s) Covered |
Status |
Downloadable Information |
Types of Point/ Nonpoint Sources |
Approved by EPA |
Implementation Plans/Activities |
Staff Contact Name |
| East Verde River - American Gulch to Verde River |
Arsenic and boron |
|
|
Under investigation |
No |
No |
K. Palmer
|
| Oak Creek - headwaters to Verde River |
Nitrogen |
The final TMDL report has been completed. CWA 319 projects
ongoing. |
In hardcopy at ADEQ
D. Cameron
|
|
1987 |
Yes |
J. Sutter
|
| Phosphorus |
|
1987 |
Yes |
| Oak Creek - headwaters to Verde River |
Nitrogen |
The final TMDL report has been completed. |
In hardcopy at ADEQ
D. Cameron
|
fish hatcheries, wildlife,
recreation, septic systems |
1999 |
N/A |
J. Sutter
|
| Phosphorus |
1999 |
N/A |
| Fecal Coliform |
The final TMDL report has been completed. CWA 319 projects ongoing. |
In hardcopy at ADEQ
D. Cameron
|
1999 |
Yes |
S. Fitch
J. Sutter |
| E. coli |
1999 |
Yes |
| Munds Creek - headwaters to Oak Creek |
Nitrogen |
The final TMDL report has been completed. |
In hardcopy at ADEQ
D. Cameron
|
waste water treatment plant |
1999 |
NPDES |
J. Sutter
|
| Phosphorus |
1999 |
| Peck's Lake |
DO |
The final TMDL report has been completed. |
TMDL Document
|
internal nutrient cycling |
05/14/02 |
Stormwater permit (NPDES) |
S. Fitch
|
| pH |
05/14/02 |
Stormwater permit (NPDES) |
| Nutrients |
N/A |
Stormwater permit (NPDES) |
Stoneman Lake
|
DO |
The final TMDL report has been completed. CWA 319 projects are
ongoing. |
TMDL Document
|
internal nutrient cycling |
09/08/00 |
Yes |
S. Fitch
|
| pH |
09/08/00 |
Yes |
| Nutrients |
09/08/00 |
Yes |
| Verde River - 15060203 to Above West Clear
Creek |
Turbidity |
The final TMDL report has been completed. |
TMDL Document
|
grazing, recreational uses |
05/14/02 |
No |
J. Sutter
|
| Verde River - 15060202-065 to Below Railroad Draw |
Turbidity |
The final TMDL report has been completed. |
TMDL Document
|
grazing, recreational uses |
05/14/02 |
No |
J. Sutter
|
| Verde River - headwaters to West Clear Creek |
Phosphorus |
Further sampling to characterize contributions from groundwater is necessary. ADEQ is supporting the USGS Verde basin investigation. Assimilation study on hold until data is available. |
|
effluent discharges, growth |
No |
No |
J. Sutter
|
| Nitrogen |
No |
No |
| Verde River - Oak Creek to Fossil Creek |
Nitrogen |
The final TMDL report has been completed. |
In hardcopy at ADEQ
D. Cameron
|
|
1987 |
No |
J. Sutter
|
| Phosphorus |
|
1987 |
No |
| Verde River Sycamore Creek - Oak Creek |
Turbidity |
The final TMDL report has been completed.
|
TMDL Document
|
grazing, recreational uses |
05/14/02 |
U.S. Forest Service has implemented grazing, road, grassland and stream restoration BMPs. |
J. Sutter
|
| Watson Lake |
Nitrogen, dissolved oxygen, pH |
|
|
Under investigation |
No |
No |
S. Fitch
|

Upper Gila Watershed
| Impaired Water |
Pollutant(s) Covered |
Status |
Downloadable Information |
Types of Point/ Nonpoint Sources |
Approved by EPA |
Implementation Plans/Activities |
Staff Contact Name |
| Gila River - Bonita Creek to Yuma Wash |
E. coli and sediment |
|
Fact Sheet |
Under investigation |
No |
No |
D. McCarty
|
| Gila River - Skully Creek to San Francisco River |
Selenium |
|
Fact Sheet |
Under investigation |
No |
No |
D. McCarty
|
| Luna Lake |
Nitrogen |
The final TMDL report has been completed. |
Fact Sheet
|
internal nutrient cycling,
wildlife, grazing, septic
systems |
09/08/00 |
In Process |
S. Fitch
|
| Phosphorus |
09/08/00 |
In Process |
| pH |
09/08/00 |
In Process |
| DO |
09/08/00 |
In Process |

Back |